Global Markets

Global Markets — Certified for Yours

One product. Every market. We supply windows and doors to buyers across North America, Europe, the United Kingdom, Australia & New Zealand, the Middle East and Southeast Asia — each with its own certification, code and climate requirements.

Aluminium-framed folding glass doors opening onto a terrace

Market Comparison

Key differences across the markets we serve at a glance.

FactorNorth AmericaEuropeUnited KingdomAustralia & NZMiddle EastSoutheast Asia
MOQ1×40HQ1×40HQ1×40HQ1×20GP (~100–150 units)1×40HQFrom 30–50 units
Production Lead Time25–30 days25–30 days25–30 days25–30 days25–30 days25–30 days
Primary DriverCode complianceCE + thermal performanceMarking route + Part LCertificationRelationshipsPrice
Key CertificationNFRC, AAMA/NAFSCE EN 14351-1UKCA or CE, BS EN 14351-1, PAS 24AS2047, WERSGCC, DCL, SASORCEP guidance
Finish StandardBlack / dark bronzeFull RAL rangeFull RAL rangeDulux colour matchPVDF RAL7016Fly screens standard
Compliance RiskNFRC whole-assemblyCPR docs per linePAS 24 evidence per product lineExpired certsGCC QR from Sep 2026Tariff classification

Lead time does not change with the destination — production is the same for every market. It is the window for a custom order, not a catalogue item: a made-to-measure window or door runs about 25–30 days from the point where your drawings are approved and the deposit is paid — not from first enquiry and not from the order date on its own. FOB covers the goods to the port of loading and on board; sea freight and destination clearance are additional and depend on the port, so we do not quote a fixed transit time. What does differ between markets is certification and testing (NFRC, AS2047, CE/DoP, UKCA), which runs on its own timeline. Every range on this page is indicative: the actual schedule is set by the factory and confirmed in writing when the order is placed.

Lead Time Breakdown

Indicative production timeline for a custom order. The 25–30 day window starts when the drawings are approved and the deposit is paid. Actual timelines depend on order complexity and factory capacity — this is a reference range, not a fixed commitment.

StageIndicative
Design & drawing review — before the production clock starts1–2 weeks
Sample / mock-up — only if a new sample is required first; also before the production clock2–3 weeks
Production clock startsDrawings approved and deposit paid
Production, final inspection, packing and delivery to the port25–30 days
Sea freight and destination clearanceAdditional — depends on the port and destination

How We Serve Every Market

Frame-First Delivery

Frames are shipped first so on-site installation can begin while glass and hardware follow. This staging approach cuts project timelines by up to 30% and reduces site storage requirements.

Trial Orders, Scaled Up

Start with a small batch to validate quality, fit, and documentation. Once confirmed, we scale production to full container quantities with the same factory line and QC protocols.

Customs & Documentation

Every shipment includes complete customs-ready documentation: certificate of origin, packing list, commercial invoice, bill of lading, and market-specific compliance certificates. No surprises at the border.

Ready to Start Your Market Assessment?

Tell us your target market and project scope. We'll provide a preliminary assessment including certification requirements, estimated lead times, and MOQ feasibility — free of charge.

Start Your Assessment